Case Study: Empowering Cross-Site Logistics in Riyadh with the MX-DT35

Kylian James
Marketing Engineer, Machinex Global
[email protected]
+852 9057 9035
Table of Contents

Client: Heavy Equipment Distributor – Riyadh, Saudi Arabia
Industry: Construction Logistics
Forklift Deployed: MX-DT35 Diesel Forklift
Challenge: Cross-site material handling with demand for high torque, fast delivery, and low emissions
The Challenge: Power & Performance Without Compromise
In early 2024, a Riyadh-based heavy equipment distributor approached Machinex with a very specific problem.
The client had recently expanded its construction logistics operation across multiple project sites in and around the Riyadh Industrial Zone.
Their existing fleet of forklifts—though branded—was struggling to keep pace.
Pain Points Identified:
Inconsistent torque on ramps and rough terrain
High emissions causing issues in semi-enclosed site zones
Delays in equipment delivery from traditional OEMs
Rising operational and maintenance costs
The client needed a forklift that could haul heavy loads, maintain operational efficiency in extreme temperatures, and be delivered without a 6-week wait time—a common bottleneck in the region.

The Solution: MX-DT35 Diesel Forklift
After a rapid assessment by the Machinex regional support team, the MX-DT35 was proposed.
This model stood out for its:
Mitsubishi-Isuzu engineered diesel powertrain
High torque-to-weight ratio, ideal for rugged terrain
Tier-3 emissions compliance
Ultra-compact turning radius, suited for congested job sites
Factory-direct dispatch option—reducing the typical wait by over 60%
With an urgent delivery window of under 2 weeks, Machinex arranged for priority dispatch from its Hong Kong logistics hub, including pre-delivery inspection and operator onboarding materials.
The Impact: Fewer Delays, More Control, Lower Emissions
Within the first month of operation, the client reported:
KPI | Before Machinex | After MX-DT35 |
---|---|---|
Load transfer time/site | 4.5 hours | 2.8 hours |
Downtime due to torque loss | Weekly | Rare |
Equipment delivery wait | 6–8 weeks | 12 days |
Fuel efficiency | Moderate | Improved 15% |
Operator feedback | Mixed | Highly Positive |
Conclusion: A Model Built for the Middle East
The success of this deployment reaffirmed Machinex’s approach to designing forklifts with real-world logistics demands in mind. For markets like the Middle East—where conditions are tough, timelines are tight, and performance is non-negotiable—the MX-DT35 proved not just capable, but mission-critical.